Occurrence of Attributes in Original Text
The text related to the cultural heritage 'Mountain Railways of India' has mentioned 'Construction' in the following places:
Occurrence Sentence | Text Source |
---|---|
Some mountain railways, such as the Jammuxe2x80x93Baramulla line, are currently under construction, and others are in the planning stage, such as the Srinagarxe2x80x93Leh line, the Bilaspurxe2x80x93Leh line, the Jammuxe2x80x93Poonch line, and the Chota Char Dham Railway. | WIKI |
Until the railway's construction, the only access to Shimla was by village cartway. | WIKI |
Its construction was led by Abdul Peerbhoy and financed by his father, Sir Adamjee Peerbhoy, of the Adamjee Group. | WIKI |
The route was designed in 1900, with construction beginning in 1904 and completed in 1907. | WIKI |
The railway line has been under construction since 2002, when it was declared a national project. | WIKI |
The Rishikeshxe2x80x93Karnaprayag Railway, also an under construction, is a new railway link extension from the exiting Rishikesh railway station to Karnaprayag of the above system. | WIKI |
The innovative design includes six zigzag reverses and three loops with a ruling gradient of 1:31.The construction of the Nilgiri Mountain Railway, a 45.88 kilometer long meter-gauge single-track railway was first proposed in 1854, but due to the difficulty of the mountainous location the work only started in 1891 and was completed in 1908. | UNESCO |
The world's highest multi-arc gallery bridge and the world's longest tunnel (at the time of construction) of the KSR were the a testimony toof the brilliantce engineering skills applied to make thisa dream a reality. | UNESCO |
The Mountain Railways of India exhibit an important cultural and technologicaly transfer in the colonial setting of the period of its construction, particularly with regard to the eminently political function of the terminus station, Shimla.. | UNESCO |